<html>
  <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8">
  </head>
  <body text="#000000" bgcolor="#FFFFFF">
    <p><font size="-1"><font face="Verdana">Lynelle, <br>
          <font face="Verdana">In the Ontario Building Code <font
              face="Verdana">"S</font>ection 9.8.6.2 - Required
            Landings" has everything to say about where<font
              face="Verdana"><font face="Verdana"> and</font> when<font
                face="Verdana"> a landing is required. <br>
                <font face="Verdana">It is quite possible that a landi<font
                    face="Verdana">ng is not required, if your sit<font
                      face="Verdana">uations all fit the details of </font>9.8.6.2
                    (3) (b).<font face="Verdana">, which cover all
                      secondary doors in a home. You may still have to
                      designate <font face="Verdana">which of the t<font
                          face="Verdana">hree doors is your</font></font>
                      primary entrance, and provide a landing there. <br>
                      There <font face="Verdana">are</font> more
                      possibilities and details, so it is best to look
                      at that section in the OBC, to see which fits your
                      situation.<br>
                      <font face="Verdana">Cheers,<br>
                        <font face="Verdana">Frank Tettemer</font></font></font></font></font></font></font></font></font></font><br>
    </p>
    <br>
    <div class="moz-cite-prefix">On 2019-12-02 12:46 PM, Lynelle A.
      Hamilton wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:a0da8640-aa73-d533-755c-fae1d9697aa6@lahamilton.com">
      <meta http-equiv="content-type" content="text/html; charset=utf-8">
      <p><font size="+1"><font face="Gill Sans MT">A discussion with a
            building inspector prompts this. <br>
          </font></font></p>
      <p><font size="+1"><font face="Gill Sans MT">I have 3 separate
            exits off sliding doors that have stairs that span a height
            of 2 feet. </font></font><font size="+1"><font face="Gill
            Sans MT">The top step is level with the door threshold, so
            there is approx 18" depth at the top.  </font></font><font
          size="+1"><font face="Gill Sans MT">There are three additional
            steps. The inspector is requiring a landing at the top
            because there are more than 3 risers overall.<br>
          </font></font></p>
      <p><font size="+1"><font face="Gill Sans MT">I can't find the
            section of the Ont. BC that mandates a landing, and my
            carpenter says he's never encountered this. <br>
          </font></font></p>
      <p><font size="+1"><font face="Gill Sans MT">Can anyone shed light
            on this?</font></font></p>
      <p><font size="+1"><font face="Gill Sans MT">Thanks!</font></font></p>
      <p><font size="+1"><font face="Gill Sans MT">Lynelle</font></font><br>
      </p>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Greenbuilding mailing list
to Send a Message to the list, use the email address
<a class="moz-txt-link-abbreviated" href="mailto:Greenbuilding@bioenergylists.org">Greenbuilding@bioenergylists.org</a>

to UNSUBSCRIBE or Change your List Settings use the web page
<a class="moz-txt-link-freetext" href="http://lists.bioenergylists.org/mailman/listinfo/greenbuilding_lists.bioenergylists.org">http://lists.bioenergylists.org/mailman/listinfo/greenbuilding_lists.bioenergylists.org</a>
</pre>
    </blockquote>
    <br>
  </body>
</html>