it is only technology where any compound is broken in primary elements
Example CH4 methane will break into carbon and hydrogen. now these can be
used as good fuel to generate power. and other metals will vetrified and
used as mettle in construction. In this technology flue gas does not
contain any pollutant like furan etc.

Sunil Rawal
Achintya Projects &Services
Mumbai
9967064472
On 28 Mar 2014 16:53, "Gerald Kutney" <gkutney at 6esm.com> wrote:

> There have been lots of useful suggestions.  Most often plasma-related
> technologies have been recommended.  What are the advantages of plasma over
> other gasification methods for treating MSW and related wastes, such as
> marine?
>
>
>
> Gerald
>
>
>
>
>
> *From:* Gasification [mailto:gasification-bounces at lists.bioenergylists.org]
> *On Behalf Of *Sunil K Rawal
> *Sent:* Friday, March 28, 2014 12:09 AM
> *To:* Discussion of biomass pyrolysis and gasification
> *Subject:* Re: [Gasification] Marine Wastes
>
>
>
> plasma gasification has many routes. graphite electrodes plasma and plasma
> torch. plasma torch again have air plasma torch and steam plasma torch. we
> have commissioned air plasma torch based system in India in 2010 and it is
> running successfully. operating to despose 3000kg per hour industrial
> hazardous waste. plasma gasification is best process to avoid any pollution
> as it burn substance at more than 1400 deg centigrade to break any compound
> in primary elements and so avoid formation of furan etc gases.
>
> it is very well viable and we can provide even skid mounted system also.
>
> I know many system failed due to wrong design but in japan such system is
> working since 2006 for MSW also and generating electricity.
>
> Sunil Rawal
> Achintya Projects &Services
> Mumbai
> 9967064472
>
> On 27 Mar 2014 18:41, <linvent at aol.com> wrote:
>
> The DoD has tried to use plasma gasification for MSW and it was a
> miserable failure, costing huge input power, high operating expenses
> including replacing carbon electrodes as expensive and frequent,
> inconsistent performance, never achieving the rated output and very
> unstable operation. The multi-million dollar system was scrapped. Others
> have also made it to the scrap yard.
>
>
>
> We have a small gasification system that can operate on marine waste,
> MSW/RDF, a system for presorting the MSW into a RDF as a single unit, and
> operate an IC engine as an independent unit and or supply thermal power. It
> is 18 ft. x 8 ft and around 8 ft. tall and operates on around 200
> pounds/hour and when mixed with other materials, can also operate on waste
> oils such as those that might be derived from bilge water. It produces a
> white/grey ash with some clinker in it, with very low carbon content and
> volumetric reduction of 90%+.
>
>
>
> To those who are considering developing this type of system, any existing
> process used in gasification should be discarded to avoid wasting a huge
> amount of time and resources without success. This comes after many decades
> of seeking innovative methods to address the problems. The list of what
> doesn't work is quite extensive.
>
> Sincerely,
>
> Leland T. "Tom" Taylor
>
> Thermogenics Inc.
>
> www.thermogenics.com
>
> 505-463-8422
>
>
>
> -----Original Message-----
> From: Sunil K Rawal <sunilkrawal at gmail.com>
> To: Discussion of biomass pyrolysis and gasification <
> gasification at lists.bioenergylists.org>
> Sent: Thu, Mar 27, 2014 3:39 am
> Subject: Re: [Gasification] Marine Wastes
>
> plasma gasification is only best solution and i have experience as project
> incharge of such plant to despose of the industrial hazardous waste and
> generate power.
>
> we can provide you consultancy  for this project
>
> Sunil Rawal
> Achintya Projects &Services
> Mumbai
> 9967064472
>
> On 27 Mar 2014 01:07, "Gerald Kutney" <gkutney at 6esm.com> wrote:
>
> Is anyone aware of the use of gasification (or pyrolysis) to treat solid
> marine wastes from ships and vessels; either at the vessels or at the
> ports.  If not, I plan to look at treating MSW as a proxy.  Any comments or
> ideas?
>
>
>
>
>
> Gerald Kutney, Ph.D.
>
> Managing Director
>
> Sixth Element Sustainable Management
>
> Executive Management Consultants for Start-ups
>
> www.6esm.com
>
>
>
>
> _______________________________________________
> Gasification mailing list
>
> to Send a Message to the list, use the email address
> Gasification at bioenergylists.org
>
> to UNSUBSCRIBE or Change your List Settings use the web page
>
> http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org
>
> for more Gasifiers,  News and Information see our web site:
> http://gasifiers.bioenergylists.org/
>
> _______________________________________________ Gasification mailing list  to Send a Message to the list, use the email address Gasification at bioenergylists.org  to UNSUBSCRIBE or Change your List Settings use the web page http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org  for more Gasifiers,  News and Information see our web site: http://gasifiers.bioenergylists.org/
>
>
> _______________________________________________
> Gasification mailing list
>
> to Send a Message to the list, use the email address
> Gasification at bioenergylists.org
>
> to UNSUBSCRIBE or Change your List Settings use the web page
>
> http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org
>
> for more Gasifiers,  News and Information see our web site:
> http://gasifiers.bioenergylists.org/
>
> _______________________________________________
> Gasification mailing list
>
> to Send a Message to the list, use the email address
> Gasification at bioenergylists.org
>
> to UNSUBSCRIBE or Change your List Settings use the web page
>
> http://lists.bioenergylists.org/mailman/listinfo/gasification_lists.bioenergylists.org
>
> for more Gasifiers,  News and Information see our web site:
> http://gasifiers.bioenergylists.org/
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.bioenergylists.org/pipermail/gasification_lists.bioenergylists.org/attachments/20140328/65fedc20/attachment.html>


More information about the Gasification mailing list